African Gold Group, Inc. reported additional significant results from Phase 1 drilling program at Kobada Gold Project. The drill holes are located in the southern section of the main shear zone at AGG’s extensive land package in Southern Mali. Result continue to return better than expected grades within the central zone of the Kobada main shear and reinforces the predictiveness of its geological model. High-grade intersections over a greater thickness, together with additional resources in the satellite orebodies, is expected to complement the resource model favorably. Highlights Include: Drill hole KP19_P1_20 returned 26.50 g/t Au over 1.0 m. Drill hole KP19_P1_21 returned 1.67 g/t Au over 21.60 m, including 11.9 g/t Au over 2.0 m and 7.14 g/t Au over 1.1 m. Drill hole KP19_P1_21 returned 4.93 g/t Au over 1.3 m, 2.94 g/t Au over 1.6 m and 2.78 g/t Au over 1.0 m. Drill hole KP19_P1_23 returned 1.93 g/t Au over 3.45 m and 2.59 g/t Au over 1.0 m. Drill hole KP19_P1_23 returned 5.41 g/t Au over 0.91 m. Drill hole KP19_P1_27 returned 4.18 g/t Au over 1.5 m. Drill hole KP19_P1_28 returned 6.07 g/t Au over 1.0 m and 4.13 g/t Au over 1.0 m. Drill hole KP19_P1_31 returned 2.67 g/t Au over 5.61 m, including 5.25 g/t Au over 2.61 m. Drill hole KP19_P1_31 returned 4.79 g/t Au over 2.0 m, 1.34 g/t Au over 4.63 m and 3.76 g/t Au over 1.0 m. Drill hole KP19_P1_32 returned 1.13 g/t Au over 5.5 m, including 5.12 g/t Au over 1.1 m.