QUARTERLY ACTIVITIES REPORT for period ending: 31 March 2014

ACN: 117 127 590

33 Richardson Street West Perth WA 6872
E: info@toroenergy.com.auW: www.toroenergy.com.au

CORPORATE

$4.5 million received during the quarter pursuant to the $10 million Subscription Agreement signed in December 2013 with South African investment fund, RealFin Capital Partners ('RealFin').

Cash at end of the quarter was $9.4 million.

WILUNA URANIUM PROJECT (WA)

Completion of independent Mining Scoping Study and a Preliminary Economic Assessment1

integrating Lake Maitland deposit into the Wiluna mining schedule, providing:

o An initial operations life of 16+ years;

o Average C1 cost for life of project of US$31.1/lb;

o Average annual production over the first 10 years - 2.0Mlb U3O8; and
o Average processing head grade of 883ppm for the first 10 years;

Millipede and Lake Maitland environmental approval and assessment process initiated with the

Western Australian and Federal Governments;

Tailings and geotechnical studies and resources drilling program initiated.

URANIUM MARKET

Lead spot price indicator closed slightly down US$0.75 down from the December 2013 quarter at

US$34.00lb, but has retreated further during April currently trading at US$30.75/lb.

Limited market liquidity has led to the long term price indicator to fall US$5.00lb from the

December 2013 quarter to US$45.00/lb.

During, and since the end of, the quarter, the Japanese government has confirmed its commitment to clean energy policy and the importance of nuclear.

China's commitment to nuclear expansion continues with two units commissioned this year and a further five to be commissioned.

CNNC's acquisition of a 25% interest in Paladin's Langer Heinrich evidence of China's strong

demand for raw materials.

South Korea announce US$7 billion plans to build two new 1,400 MWe plants by 2020.

EXPLORATION

Selected non-core greenfields exploration ground surrendered in WA and NT as part of rationalisation of less prospective ground; and

JV negotiation progress over a number of other prospective Australian greenfields uranium tenements.


1 Refer ASX release 30 January 2014 and 19 November 2013

Toro Energy Limited - Quarterly Report 1


1. C o r p o r a t e

Within the terms of the RealFin Subscription Agreement2, RealFin subscribed for the following shares over the period, including "ahead of time" payments:

Initial

Subscription

Final Subscription

Date

Amount

due

Amount

received

Shares

issued

Price

per share

Tranche 1

24th December 2013

$1,000,000

$1,000,000

13,698,630

$0.0730

Tranche 2

28th February 2014

$2,000,000

$1,000,000

14,409,222

$0.0694

Tranche 2

28th February 2014

$2,000,000

$1,000,000

15,552,299

$0.0643

Tranche 3

31st May 2014

$2,000,000

$1,500,000

23,474,178

$0.0639

RealFin has A$0.5m remaining under the initial subscription agreement that will be executed on or before 31 May 2014 and a further optional subscription of $5m that can be subscribed for by RealFin at its sole election any time up until 1st July, 2014.
As at 31 March 2014 Toro had $9.4 million cash on hand.

2. W i l u n a U r a n i u m P r o j e c t ( W A )

2 . 1 . M i n i n g S c o p i n g S t u d y a n d P r e l i m i n a r y E c o n o m i c A s s e s s m e n t

During the quarter, Toro announced the completion of an independent Mining Scoping Study and a Preliminary Economic Assessment (PEA) integrating the newly acquired Lake Maitland deposit into the Wiluna Uranium Project in Western Australia.
Based solely on mining at the already environmentally approved Centipede and Lake Way deposits and the yet to be approved Millipede and Lake Maitland deposits, the studies confirmed:

An initial mine operations life of 16 years;

20.1Mt ore mined @ 799 parts per million (ppm), including 15.9Mt ore @ 907ppm;
Processing head grade: 883ppm average over the first 10 years;
Total production at life of mine recovery of 85.6% - 30.2Mlb U3O8;
Average annual production over the first 10 years - 2.0Mlb U3O8; and
Average C1 cost for life of project of US$31.1/lb.
The PEA included process plant design information and capital costs from the Phase 1 Definitive Feasibility Study (DFS) completed in November 2012 and a new independent mining scoping study completed by Tetra-Tech Proteus.
The strategic acquisition of Lake Maitland, completed in November 2013, provided Wiluna with additional high grade resources to add to those at Centipede, Millipede and Lake Way. The mining study re-assessed the mining plan based on a high-grade mining scenario incorporating the Centipede, Lake Way, Millipede and Lake Maitland deposits.

2 . 1 . 1 . C o n t i n u i n g E n g i n e e r i n g

Engineering work over the period has focused on geotechnical and tailings work required for the DFS Phase 2.

2 Refer ASX release 24 December 2013 (RealFin Subscription Agreement Terms)

Toro Energy Limited - Quarterly Report 2



A program of work to define the geotechnical parameters of the processing facility, haul roads, service infrastructure and the Millipede pit footprint has been integrated into the resource drill program which is currently underway.
Significant progress was made on the design of a tailings test-work program. The anticipated outcomes of the program are improved water recovery from tailings which will have the benefits of increasing water recovered to the processing facility and reducing the volume of tailings to be stored.

2 . 1 . 2 . R e s o u r c e

Toro initiated its largest ever drilling program at Wiluna during the period. A total of 1,600 holes for
16,000 m is planned consisting of four 100x100 m grade control grids inside each of the core Wiluna deposits, Centipede, Millipede, Lake Maitland and Lake Way. Both sonic core and aircore drilling will be utilised. The aim of the program is:

To ascertain if the current Indicated and Measured resource estimate and block model of the Centipede, Millipede, Lake Maitland and Lake Way deposits is representative of the actual grade and metal content to an accuracy that can qualify for a 2012 JORC compliant maiden Probable Reserve;

To discover the small-scale spatial distribution and pattern of the ore body and confirm if such spatial distribution is amenable to the proposed mining methods and ultimately prove the grades to the mill in the economic model; and

To define the optimum drill spacing for any future grade control drilling during mining, for the least possible expense without jeopardizing grades to the mill.

A Wiluna resource table has been included at Appendix 2 of this report.

2 . 2 . A p p r o v a l s a n d C o m m u n i t y

The environmental approval process for mining at Millipede and Lake Maitland was initiated with the Western Australian and Federal Governments. The Western Australian Environmental Protection Authority (EPA) has set the level of assessment at Public Environmental Review (PER) and the process will be conducted under the bi-lateral agreement between the two jurisdictions. Publication of an Environmental Scoping Document (ESD) is not planned to be submitted to the EPA by the end of May. The ESD establishes the environmental studies necessary to complete the PER. The PER will be open for public review for a 12 week period and Toro is planning its publication in the first half of 2015.
Toro has initiated consultation with the Kultju people who claim an interest in Lake Maitland. At a meeting in Kalgoorlie, representatives of the Kultju were briefed on Toro's plans for developing Lake Maitland and there were also discussions about the negotiation of a mining agreement.

3. U r a n i u m M a r k e t

The spot uranium price at the end of the quarter was US$34.00/lb, consistent with trading levels at the end of December 2013. However the long term uranium price fell US$5.00/lb during March to US$45.00/lb and the spot price has fallen to US$31.00/lb during April3. Overall current spot demand
is weak with low levels of liquidity.
However the medium to long term demand outlook remains positive with the emerging economies committed to the significant growth in reactor build out programs. During the quarter, Japanese Prime Minister Abe confirmed the importance of nuclear energy within Japan's energy policy mix for the next 20 years. The nuclear restart program in Japan is drawing closer with applications made by utilities for the re-start of 17 facilities over the course of 2014 and 2015. Industry expects this to be positive for overall sentiment and a sign that inventory build-up in Japan will begin to be drawn down.

3 Trade Tech's Nuclear Market Review

Toro Energy Limited - Quarterly Report 3



In South Korea, plans for a US$7 billion build of two new 1,400 MWe reactors by 2020 were announced. China continues its aggressive nuclear build and expansion program as it endeavours to improve its air quality and energy structure. CNNC's acquisition of a 25% interest in Paladin's Langer Heinrich project is further evidence of China's continuing need to import raw materials to support the expanding nuclear industry.

4. E x p l o r a t i o n

The Company is focused on maintaining its highly prospective exploration portfolio whilst balancing its responsibility to preserve cash in the current market. Key exploration tenements continue to be developed however a number of non-core greenfields exploration tenements have been surrendered in both the Northern Territory and Western Australia to assist cash management and preservation.
Significant progress has been made regarding negotiations to secure JV partners over a number of the
Company's greenfields tenements in Australia.

5. T e n e m e n t M o v e m e n t s

An updated tenement status map is attached at Appendix 1.
Tenement movement details are included in Appendix 5B attached to this report.

Toro Energy Limited - Quarterly Report 4

RO

' [ LIMITED


APPENDIX l: Tenement Status Map

WILUNA URANIUM PROJECT

TENORE STATUS

March2014

MirfnR Leases

-Grcnltd

- Applic.ation

Epl cratlcn & Prospectin8 Licenees

-Granted

- Application

Misccllo:mcou:;& Gcncr.JIUccnccs

-Gront ;d

- Application

B c

EXPLORATION PROJECT AREAS

March2014

-Tenement Grant d

- Tenement Applkation

-T rwrmmt App.i' coticn inCOfljtic:

- !r Morato m.rn

w o

Hdmt

2

ELJ..25c...'-. Am,a

deus

OCEA

NAMIBIA

Deep Yellow )V

'-....--........ F!A:>I0i 4JI

Ano o 100

· - -- ' -' - km


Toro Energy Limited - Quarterly Report 5


APPENDIX 2: Wiluna Resource Table4

3 8

4 Refer ASX release 19 November 2013

Toro Energy Limited - Quarterly Report 6

distributed by