16 February 2017
The Manager Announcements Australian Stock Exchange Limited GPO Box 100A
Hobart TAS 7001
Technical Report
Dear Sir/Madam,
Tasmania Mines Limited (TML) has today released an updated Technical Report as at 31 December 2016 prepared by Mr A.O. Fudge of Polberro Consulting for Kara No. 1 reserve estimate (attached).
Yours faithfully
Tasmania Mines Limited
/( ,/)
Ken Broadfoot
Director
Tasmania Mines Kara No 1 Magnetite Deposit Ore Reserve Report January 2017Kara No 1 SE Pit & Haul Road
Prepared by:
Of: -
Alan D Fudge MSc BSc MAusIMM
Polberro Consulting Table Cape, TAS, 7325 Tel (03) 64421477
Emailalanfudge@polberro.com.au
On behalf of: -
Tasmania Mines Ltd
Executive SummaryThis reserve estimate is produced for Tasmania Mines for annual reporting and audit purposes. The Kara No 1 reserve has been estimated based upon the January 2017 digital resource model as described in both the December 2014 Kara No 1 Resource report and January 2017 technical memorandum (Resource and Exploration Geology) utilising an FeO>30% mineralised cut off (see Appendix 6). References to global in-situ resource in this report correspond to the January 2017 digital resource model.
Reference to minable resource referred to in this report represents the FeO>30% component of the global in-situ resource that lies above the current pit life of mine (LOM) pit DTM and which has not been sterilised by its location.
- Kara No 1 Global Resource is 14,600,000 tonnes at 49.5% FeO
- Kara No 1 Minable Resource is 10,304,000 tonnes at 50.2% FeO
- Kara No 1 Total Ore Reserve is 9,974,000 tonnes at 49.7% FeO
The Kara No 1 pit life based upon the current production rate of 400,000 tonnes of ore per annum is 25 years.
This reserve estimate is derived from sectional perimeters which represent realistic mining shapes and include planned waste and low grade dilution. Reserve perimeter sets utilise, but are not wholly constrained by, the LOM pit shape as a guide. The reserve estimate excludes 95,000 tonnes of inferred resources (59.5% FeO) that lie within the LOM pit boundary and will be mined during the normal operation of the open pit.
It is estimated that 7% of the material reporting to the reserve within the pit design shell contains material classified as oxidised. It is currently considered that up to 30% of this oxidised material is unsuitable for generation of a magnetite product and may have weathered to limonite, goethite, haematite etc. The estimate for oxide material has been adjusted in this reserve estimate accordingly and a 30% reduction factor is applied to oxide reserve estimates reflecting current applied practice in the open cut which indicates an increased throughput of oxidised ore compared to 2014 and 2015.
Table of Contents1. Executive Summary 2
Introduction 4
Location 5
Geology 6
History 8
Production 9
Processing 10
Reconciliation 11
Resource Estimates 12
Reserve Estimation 13
Mineralised Resources 15
Current and Future Work 18
References 19
Limitations and çonsent 20
Appendices
Appendix 1 Conversions Used 21
Appendix 2 Competent Person Statement 23
Appendix 3 Reserve Estimation Worksheets 24
Appendix 4 Break Even estimations 39
Appendix 5 Sensitivity Analysis 42
Appendix 6 JORC 2012 Check List 44
List of Figures
Figure 1 Site Location 5
Figure 2 Ore and Waste Production Chart 2008 to 2015 9
Figure 3 Location of Deposits 17
Figure 4 Optimal pit and design pit shell ‐isometric 37
Figure 5 Optimal pit and design pit shell West‐East section 37
Figure 6 Grade tonnage‐curve 41
Figure 7 Metal Price Sensitivity 43
List of Tables
Table 1 Reconciliation Estimate 11
Table 2 Kara No 1 Global Resource Estimate 12
Table 3 Kara No 1 Minable Resource Estimate 12
Table 4 Kara No 1 Mining Reserve Estimate 14
Table 5 Tasmania Mines Site Mineral Resource Summary 16
Tasmania Mines Limited published this content on 16 February 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 16 February 2017 08:44:16 UTC.
Original documenthttp://www.tasmines.com.au/TMM_Ore_Reserve_2017_Signed_Report_ASX.pdf
Public permalinkhttp://www.publicnow.com/view/9E44EF274C10C1F359104DA4DC8F3775FC0408E9