Powerhouse Energy Group plc announced that its G3-UHt Ultra-high temperature Demonstration gasification system has left the harbour in Brisbane, Australia and is bound for the UK. The transit time is estimated to be 50 days. The G3 System incorporates the latest advances in material technologies and electrical and thermal efficiencies to convert waste to energy. It is the company's reactor and has been completely redesigned, re-engineered, and constructed for commercial roll-out. The Company continues its discussions with a number of interested commercial parties for the siting of the G3 Demonstration Unit in a well-suited location including those that could be used as a commercial site.