Pensana Metals Ltd. reported the first assay results received from the first 16 holes of the 7,000 metre infill and extension drilling programme at the Longonjo NdPr Project in Angola. The programme is being undertaken in support of the Definitive Feasibility Study. The results have identified further high grade weathered mineralisation from surface over an area extending 250 by 450 metres immediately to the west of the current pit design; The results demonstrate the potential to extend the weathered zone mineralisation and the mine life in the recently reported Preliminary Feasibility Study on 15 November 2020. Several of the infill drill holes intersected higher NdPr grades than estimated by the current Mineral Resource estimate block model in this area. LRC175: 16 metres at 4.19% REO including 0.93% NdPr from surface; LRC180: 18 metres at 5.69% REO including 1.06% NdPr from surface; LRC181: 10 metres at 4.60% REO including 0.88% NdPr from surface and 8 metres at 3.52% REO including 0.59% NdPr from 16 metres to end of hole; LRC182: 16 metres at 6.53% REO including 1.27% NdPr from surface to end of hole; and LRC189: 13 metres at 6.19% REO including 1.01% NdPr from surface to end of hole.