(via NewsDirect)
Millennial Potash has released the results of its maiden Mineral Resource Estimate (MRE) for the northern part of the
The MRE encompasses both Indicated and Inferred Mineral Resources. The Indicated Mineral Resources are estimated to be approximately 657 million tonnes, with a grade of 15.9% KCl, equating to 104.6 million tonnes of contained KCl.
In contrast, the Inferred Mineral Resources are estimated to be approximately 1.159 billion tonnes, with a grade of 16.0% KCl, equating to 185.3 million tonnes of contained KCl. Abasov explained that this MRE forms a solid foundation for the upcoming Preliminary Economic Assessment (PEA).
The PEA will explore various production scenarios utilizing solution mining and will likely include a proven processing route for the production of Muriate of Potash (MOP) directly on the
These developments are significant milestones for Millennial Potash as the company advances its
Contact Details
Proactive Canada
Proactive
+1 604-688-8158
action@proactiveinvestors.com
Copyright (c) 2024 TheNewswire - All rights reserved.
Copyright (c) 2024 TheNewswire - All rights reserved., source