Highlights:
- YLP-0184: 13 m at 1.11% Li2O, (Ki)
- YLP-0171: 12 m at 1.21% Li2O, (Ki)
- YLP-0152: 5 m at 1.24% Li2O, (Nite)
Discussion of Results
This week’s drill results are for ten holes drilled on the Ki, BIG West and Nite pegmatite complexes. A table of composite calculations, general comments related to this discussion, and a table of collar headers are provided towards the end of this section.
Figure 1 – Location of LIFT’s
Ki Pegmatite
The Ki pegmatite is a north-northwest trending corridor of dykes that extends for at least 1.3 km on surface and dips steeply to the southwest. The corridor consists of between one to five dykes with a similar total pegmatite thickness of up to 25 m.
YLP-0168 tested the Ki pegmatite approximately 300 m from its southern mapped extent and 200-250 m beneath the surface. Three previously released holes are on section with this hole and returned 1.00-1.40% Li2O over 10-12 m widths at depths of 50 m (YLP-0069) and 100 m (YLP-0096) but no significant grades at 150 m depth (YLP-0155). New drilling intersected five widely dispersed pegmatite dykes over 360 m of core length, with each dyke between 1-5 m in width and returning <0.10% Li2O.
YLP-0171 was drilled to test the Ki pegmatite ~400 m from its southern mapped extent and 150 m below the surface. Two previously released holes fall on the same drill section, with YLP-0110 returning a cumulative 17 m of pegmatite averaging 1.08% Li2O at 50 m beneath the surface and YLP-0161 returning no significant results from 200 m depth. New drilling intersected a single 21 m wide pegmatite dyke that returned an assay composite of 1.21% Li2O over 12 m.
YLP-0184 is the first hole reported from the northern-most part of this corridor and was collared 750-850 m north of holes YLP-0168 and -0171. Hole YLP-0184 tested approximately 300 m from the northern mapped extent of the Ki corridor and 50 m beneath the surface. Drilling intersected an 18 m pegmatite dyke flanked by two, 1 m wide dykes, with assays from the thicker dyke returning a composite of 1.11% Li2O over 13 m (Table 1 & 2, Figures 2 & 3).
Figure 2 – Plan view showing the surface expression of the Ki pegmatite with diamond drill holes reported in this press release.
Figure 3 – Cross-section illustrating YLP-0171 with results as shown in the Ki pegmatite dyke with a 12 m interval of 1.21% Li2O.
Nite Pegmatite
The Nite pegmatite complex comprises a north-northeast trending corridor of parallel-trending dykes that is exposed for at least 1.4 km of strike length, ranges from 10-200 m wide, and dips approximately 50°-70° degrees to the east.
YLP-0152 was designed to test the Nite pegmatite approximately 400 m from its northern mapped extent and 50 m beneath the surface. Drilling returned a 20 m wide interval bookended by 5 m and 8 m pegmatite intervals that are split by a 7 m panel of country rock. Assay composites from the upper interval returned 1.24% Li2O over 5 m whereas the lower dyke returned negligible grade.
YLP-0162 was drilled to test the Nite pegmatite ~500 m from its northern mapped extent and 200-250 m beneath the surface. Three previously released holes (YLP-0145, -0148, -0157) drilled on the same section returned 2-3 closely spaced dykes with cumulative 12-16 m of pegmatite averaging 0.90-1.30% Li2O at depths of 12.5, 50, and 150 m below the surface. Drilling of YLP-0162 intersected a 23 m interval bookended by 6 and 11 m wide pegmatite intervals split by a 6 m panel of country rock. Assays for both intervals returned cross-pegmatite composites averaging around 0.20% Li2O.
YLP-0169 explored the Nite pegmatite approximately 200 m from its northern end and 50 m beneath the surface. Drilling intersected a single 13 m wide pegmatite dyke that returned an assay composite of 0.59% Li2O over 10 m that includes 0.92% Li2O over 5 m (Table 1 & 2, Figures 4 & 5).
Figure 4 – Plan view showing the surface expression of the Nite pegmatite with diamond drill holes reported in this press release.
Figure 5 – Cross-section of YLP-0152 which intersected the Nite pegmatite dyke with a 5 m interval of 1.24% Li2O.
BIG West Pegmatite
The BIG West pegmatite complex comprises a northeast-trending corridor of parallel-trending dykes that is exposed for at least 1.5 km along strike and is steeply west dipping to subvertical. The complex is bound by two relatively continuous dyke structures that are 50-100 m apart in the northern half of the corridor and 150 m apart in the south. These dykes are here referred to as the east-bounding (EB) and west-bounding (WB) dykes. Descriptions below are ordered from southern to northern-most.
YLP-0170 tested the
YLP-0164 tested the
YLP-0154 was drilled ~450 m from the northern mapped extent of the
YLP-0167 was collared on a section ~150 m north of YLP-0154 to test the
Figure 6 – Plan view showing the surface expression of the BIG West pegmatite with diamond drill holes reported in this press release.
Figure 7 – Cross-section of YLP-0167 which intersected the BIG West pegmatite dyke with a 10 m interval of 0.78% Li2O.
Table 1 – Assay highlights for drill holes reported in this press release
Hole No. | From (m) | To (m) | Interval (m) | Li2O% | Dyke |
YLP-0152 | 64 | 69 | 5 | 1.24 | Nite |
YLP-0154 | No significant results | BIG West | |||
YLP-0162 | No significant results | Nite | |||
YLP-0164 | No significant results | BIG West | |||
YLP-0167 | 136 | 146 | 10 | 0.78 | BIG West |
YLP-0168 | No significant results | Ki | |||
YLP-0169 | 70 | 80 | 10 | 0.59 | Nite |
inc | 71 | 76 | 5 | 0.92 | Nite |
YLP-0170 | 194 | 195 | 1 | 0.76 | BIG West |
YLP-0171 | 194 | 206 | 12 | 1.21 | Ki |
YLP-0184 | 47 | 60 | 13 | 1.11 | Ki |
Drilling Progress Update
The Company has concluded its 2023 drill program at the
General Statements
All ten holes described in this news release were drilled broadly perpendicular to the dyke orientation so that the true thickness of reported intercepts will range somewhere between 65-100% of the drilled widths. A collar header table is provided below.
Mineralogical characterization for the YLP- pegmatites is in progress through hyperspectral core scanning and X-ray diffraction work. Visual core logging indicates that the predominant host mineral is spodumene.
Table 2 - Drill collars table of reported drill holes in this press release
Drill Hole | NAD83 | Easting | Northing | Elevation (m) | Azimuth (°) | Dip (°) | Depth (m) | Dyke |
YLP-0152 | Zone 11 | 647,631 | 6,936,590 | 207 | 300 | 45 | 111 | Nite |
YLP-0154 | Zone 11 | 653,970 | 6,933,567 | 195 | 118 | 50 | 225 | BIG West |
YLP-0162 | Zone 11 | 647,768 | 6,936,386 | 207 | 300 | 53 | 342 | Nite |
YLP-0164 | Zone 11 | 653,671 | 6,933,218 | 208 | 118 | 56 | 230 | BIG West |
YLP-0167 | Zone 11 | 654,067 | 6,933,686 | 194 | 118 | 46 | 186 | BIG West |
YLP-0168 | Zone 12 | 373,015 | 6,942,548 | 252 | 56 | 59 | 375 | Ki |
YLP-0169 | Zone 11 | 647,745 | 6,936,762 | 204 | 295 | 47 | 99 | Nite |
YLP-0170 | Zone 11 | 653,559 | 6,933,049 | 206 | 118 | 48 | 230 | BIG West |
YLP-0171 | Zone 12 | 373,015 | 6,942,673 | 255 | 56 | 54 | 228 | Ki |
YLP-0184 | Zone 12 | 372,929 | 6,943,401 | 256 | 58 | 45 | 102 | Ki |
QA/QC & Core Sampling Protocols
All drill core samples were collected under the supervision of LIFT employees and contractors. Drill core was transported from the drill platform to the core processing facility where it was logged, photographed, and split by diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference materials were inserted at regular intervals. Field duplicates consisting of quarter-cut core samples were also included in the sample runs. Groups of samples were placed in large bags, sealed with numbered tags in order to maintain a chain-of-custody, and transported from LIFT’s core logging facility to
Sample preparation and analytical work for this drill program were carried out by ALS. Samples were prepared for analysis according to ALS method CRU31: individual samples were crushed to 70% passing through 2 mm (10 mesh) screen; a 1,000-gram sub-sample was riffle split (SPL-21) and then pulverized (PUL-32) such that 85% passed through 75-micron (200 mesh) screen. A 0.2-gram sub-sample of the pulverized material was then dissolved in a sodium peroxide solution and analysed for lithium according to ALS method ME-ICP82b. Another 0.2-gram sub-sample of the pulverized material was analysed for 53 elements according to ALS method ME-MS89L. All results passed the QA/QC screening at the lab, all inserted standards and blanks returned results that were within acceptable limits.
Qualified Person
The disclosure in this news release of scientific and technical information regarding LIFT’s mineral properties has been reviewed and approved by
About LIFT
LIFT is a mineral exploration company engaged in the acquisition, exploration, and development of lithium pegmatite projects located in
For further information, please contact:
Francis MacDonald | |
Chief Executive Officer | Investor Relations |
Tel: + 1.604.609.6185 | Tel: +1.604.609.6185 |
Email: info@li-ft.com | Email: info@li-ft.com |
Website: www.li-ft.com |
Cautionary Statement Regarding Forward-Looking Information
Certain statements included in this press release constitute forward-looking information or statements (collectively, “forward-looking statements”), including those identified by the expressions “anticipate”, “believe”, “plan”, “estimate”, “expect”, “intend”, “may”, “should” and similar expressions to the extent they relate to the Company or its management. The forward-looking statements are not historical facts but reflect current expectations regarding future results or events. This press release contains forward looking statements. These forward-looking statements and information reflect management's current beliefs and are based on assumptions made by and information currently available to the company with respect to the matter described in this new release.
Forward-looking statements involve risks and uncertainties, which are based on current expectations as of the date of this release and subject to known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such statements. Additional information about these assumptions and risks and uncertainties is contained under "Risk Factors and Uncertainties" in the Company's latest annual information form filed on
Neither the
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/c1751f76-4ae6-4776-ba1b-ae525e14ff02
https://www.globenewswire.com/NewsRoom/AttachmentNg/67aa9591-6bd9-40ba-9434-1e459e25c8bc
https://www.globenewswire.com/NewsRoom/AttachmentNg/dbbad459-1e4f-4288-9e37-317ca47fa3be
https://www.globenewswire.com/NewsRoom/AttachmentNg/764e3152-e098-4094-8536-43f2cd253278
https://www.globenewswire.com/NewsRoom/AttachmentNg/179aaf65-3c8f-492f-bea7-d66a5f5100bb
https://www.globenewswire.com/NewsRoom/AttachmentNg/49503d22-b0c2-47d3-8380-c2cda4fdec65
https://www.globenewswire.com/NewsRoom/AttachmentNg/7c4b129a-a08c-4f81-8712-ca768fd2b6c5
Figure 1
Location of LIFT’s Yellowknife Lithium Project . Drilling has been thus far focused on the Near Field Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group .
Figure 2
Plan view showing the surface expression of the Ki pegmatite with diamond drill holes reported in this press release.
Figure 3
Cross-section illustrating YLP-0171 with results as shown in the Ki pegmatite dyke with a 12 m interval of 1.21% Li2O.
Figure 4
Plan view showing the surface expression of the Nite pegmatite with diamond drill holes reported in this press release.
Figure 5
Cross-section of YLP-0152 which intersected the Nite pegmatite dyke with a 5 m interval of 1.24% Li2O.
Figure 6
Plan view showing the surface expression of the BIG West pegmatite with diamond drill holes reported in this press release.
Figure 7
Cross-section of YLP-0167 which intersected the BIG West pegmatite dyke with a 10 m interval of 0.78% Li2O.
2024 GlobeNewswire, Inc., source