16 January 2017

Kibo Mining plc ('Kibo' or the 'Company') (AIM: KIBO; AltX: KBO), the Tanzania focused mineral exploration
and development Company, is pleased to announce that the Tanzania National Environmental Management Council
('NEMC') approved and accepted both the Mbeya Coal Mine and Mbeya Power Plant Environmental and Social
Impact Assessment ('ESIA') scoping reports.
Approval and acceptance of the scoping reports concludes Stage 2 of the required three stage statutory ESIA
approval process. Completion of Stage 2 now paves the way for final ESIA certification of both the Mbeya Coal
Mine and the Mbeya Power Plant.

Download Full Report


Mbeya Coal to Power Project Receives Final Approval for ESIA Scoping Rep

Kibo Mining plc published this content on 16 January 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 16 January 2017 07:30:03 UTC.

Original documenthttp://kibomining.com/2017/01/mbeya-coal-power-project-receives-final-approval-esia-scoping-reports/

Public permalinkhttp://www.publicnow.com/view/AA8726857F604DAFCDD4967293CAAB18A0A18AFC