European Metals Holdings Limited announced initial results from its current eight core-hole resource drilling programme at the Cinovec Project as detailed. Drilling of five of the eight holes has been completed. Drilling activities have been suspended and will resume after the end of the snow season. Analytical results for four of the drill holes from the Cinovec South deposit are reported. Resource drill holes CIS-10, CIS-11, CIS-12 and CIS-13 have been completed including analytical reports. Resource drill hole CIS-14 has been drilled with analytical results pending. Hole CIS-11 returned 129.3m averaging 0.51% Li2O, incl. 2m at 0.93% Li2O, 2m at 0.93% Li2O; 5m at 0.56% Sn and 0.11% W, 5m at 0.21% Sn, and 7m at 0.11% Sn. Hole CIS-13 returned 108m averaging 0.45% Li2O and 0.11% Sn, incl. 4m at 0.99% Li2O; 6m at 0.29% Sn, 5m at 0.34% Sn, 3m at 0.77% Sn and 0.12% W, and 2m at 1.03% Sn, incl. 1m at 1.92% Sn. Hole CIS-10 returned 89m averaging 0.47% Li2O, incl. 6m at 1.02% Li2O and 6m at 0.91% Li2O; 5m at 0.26% Sn, 5m at 0.14% Sn, and 7m at 0.077% W. Hole CIS-12 returned 93m averaging 0.48% Li2O, incl. 2m at 1.32% Li2O, 2.4m at 1.17% Li2O and 3m at 1.08% Li2O; 8m at 0.83% Li2O and 0.18% Sn, 4m at 0.13% Sn, and 5m at 0.16% W.