On October 19, 2023, the Cascina Disma facility (6 MW) was energized. Its construction is part of a framework agreement with a leading operator in the sector for the design and execution of 6 photovoltaic plants in Piedmont, totaling 40MW.

Located in the municipality of Sezzadio (Alessandria), the facility extends over 8 hectares of land and consists of 335 tracker structures and 11,268 photovoltaic modules.

Read here for more information

Attachments

Disclaimer

ESI S.p.A. published this content on 06 November 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 10 November 2023 22:13:13 UTC.