Echo Resources Limited advised that recent infill drilling has resulted in an update to, and classification upgrade of, the Mineral Resource estimate for the Orelia gold deposit. The updated Orelia Mineral Resource estimate is 15.9Mt at 2.1 g/t Au for 1.07 million ounces and is in line with the previous estimate. Importantly, the updated Mineral Resource estimate includes 2.8Mt at 2.6 g/t Au for 237,000 ounces within the Measured category. Previously the Orelia Mineral Resource estimate did not contain any material within the Measured category. Confidence in the Mineral Resource estimate for the Orelia gold deposit has been further increased with recent infill drilling Infill drilling was predominantly designed to upgrade a portion of the existing Indicated Mineral Resource within the proposed Orelia Stage 1 pit to Measured The infill drilling and revised Mineral Resource estimate was undertaken as an integral component of Echo's Bankable Feasibility Study (BFS) due diligence and finalisation process The updated resource model will further define pit design and mine plan optimisation as part of the updated Ore Reserve estimate to be contained within the BFS The Yandal Gold Project BFS remains on track for completion and release in the coming weeks.