Echo Resources Limited announced the latest results from air core (AC) drilling at the Mt Joel (70% Echo) gold district within the Yandal Gold Project. Drilling at Mt Joel is part of Echo's strategy to add incremental, near surface ounces to further enhance a planned restart of the Bronzewing processing facility in 2019. The latest batch of results has further enhanced the understanding of the Mt Joel mineralised system and provides Echo with confidence that significant additional oxide material from Mt Joel can be incorporated into the future mine plan. Consistent, high-grade results such as 20m @ 5.56 g/t Au from 33m (MJAC079) and 10m @ 3.86 g/t Au from 20m (MJAC090) highlight the high quality, near surface nature of the mineralisation. These results are in addition to previously released results such as 16m @ 5.53 g/t Au from 8m (MJAC129). Following on from the success of the AC drilling campaign, an RC resource definition drilling campaign has commenced with the aim to delineate 'Indicated' resources in the Mt Joel block model. Results from the RC drilling will be available early in 2019 and an updated resource estimate is expected in the March quarter 2019.