Dateline Resources Limited announced that it has received the final assay results for drill hole CM22-05 from the drilling program at the Colosseum Gold Project in California, US. Drill hole CM22-05 assessed areas within densely drilled parts of the deposit as well as areas below the historic resource model. 100.6m @ 4.16g/t Au from 79.24m in CM22-05 confirmed with final assay results including 19.81 metres of 5.19g/t Au from 79.24 metres; 3.05 metres of 13.78g/t Au from 80.77 metres; 16.8 meters of 6.76 g/t Au from 112.78 meters; 7.6 metres of 12.74 g/t Au from 132.59 metres; 4.6 metres of 7.lOg/t Au from 158.50 metres.

The Company is advanced in the estimation of a JORC-2012 compliant Mineral Resource for the Colosseum deposit. The drilling program, comprising five holes for 605 metres, confirmed the geology of the deposit, as informed by the original paper-based data compilation. The geologists collected information including lithology, veining, alteration, mineralisation, oxides and rock quality designation (RQD).

Samples were collected every five feet (~1.s2m) and assayed at Paragon Geochemical Laboratory in Reno Nevada. QA/QC including duplicates, standards and blanks were included in the sampling and assaying program.