Expanding a rich resource in Mexico
ZINC IS IN DEMAND
BEST PERFORMER LONDON
METALS EXCHANGE (LME) 2016
Goldman Sachs predicting worldwide shortage of zinc to increase to 360,000t in 2017 Chinese infrastructure projects driving demand LME warehouse stocks are down 2THE PLOMOSAS PROJECT
Multiple, very high grade Zn-Pb-Ag deposits grading 18-25% Zn+Pb with 60g/t Ag
Granted Mining Leases (to 2042)
Significant exploration upside, immediate drill targets, 7km strike
Near-term production asset
Established underground access to mineralization
Excellent infrastructure
Historically clean mineralogy and high metallurgical recoveries
Low cost and low capex mining and processing options
CZL 80% ownership, rights to acquire 100%
GRADE IS KING
Widespread in-mine sampling confirm high grade resource
Historic mine grade averaged 24% Zn+Pb plus Ag credits
Produced clean concentrate - no deleterious elements
Drilling to establish resource tonnes - maiden JORC end 2016
Consolidated Zinc Limited published this content on 27 September 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 28 September 2016 04:50:02 UTC.
Original documenthttps://www.consolidatedzinc.com.au/wp-content/uploads/2016/09/Mines-Money-September_2016-FINAL.pdf
Public permalinkhttp://www.publicnow.com/view/376E8C765C61F3E0DDF2B0F864794D92E2B07F24