European Cobalt Ltd. announced the commencement of the 2018 diamond drilling campaign at Dobsina Cobalt-Nickel Sulphide Project. The drilling aims to test approximately 375m of strike both up dip and down dip of the mineralisation delineated by previous underground channel sampling. Initially five drill holes have been planned to be completed in order to gain a further understanding of the structural controls, geometry and extent of mineralisation. Upon refurbishment providing suitable drill positions within the Joremeny Adit, underground drilling will be prioritised. A total of five diamond drill holes have been planned to target mineralisation both up dip and down dip of the Joremeny Adit. These holes have been targeted based on the historical underground channel sampling completed. The location and orientations of holes are subject to change based on the visual logging of the drill core.