Apollo Consolidated Limited reported new assay results from its ongoing drilling program at the Lake Rebecca Gold Project. Drilling at the Rebecca deposit included infill and step-out exploration tests of the main mineralised surfaces (Laura, Maddy & Jennifer lodes), and precollars in preparation for future diamond drilling extensions. Infill RC drilling along Laura Lode continued to return strong true-width gold results, confirming continuity in the geological model: RCLR0505 19m @ 3.37g/t Au (including 2m @ 16.0g/t Au); and RCLR0511 14m @ 2.57g/t Au. Diamond `tails' targeting northern extensions of Maddy Lode returned significant results, showing the surface remains open to the north and down dip: RCDLR0490 11m @ 3.45g/t Au; and RCDLR0382 16m @ 2.03g/t Au. An exploration RC hole (RCLR0506) located 200m south of Jennifer Lode intersected potential new hangingwall mineralised surfaces, with hits including 3m @ 8.45g/t Au and 5m @ 1.78g/t Au. Further exploration drilling in this area will resume in coming weeks: Step-down RC hole RCLR0524 at the Duchess gold system returned an interpreted true width 18m @ 1.37g/t Au, confirming down-dip continuity at this location; Cleo continues to emerge as a new exploration target, with zones of gold anomalism over 600m strike and new results to 5m @ 1.46g/t Au & 4m @ 0.98g/t Au. This release brings up to date the majority of the drilling from 2019 at the Lake Rebecca Gold Project, located 150km ENE of Kalgoorlie. During 2019 a total of 225 drill holes were drilled for a total of 38,004m. The drilling tested a variety of targets including mineralisation delineation, exploration and precollar drilling along the 1.7km long Rebecca mineralised corridor. The drilling has continued to find significant gold zones in what is a very large mineralisation system. During 2019 of all the assayed intercepts above 0.50g/t, approximately 75% sit in the grade range between 0.50g/t and 2.00g/t, 15% of the intercepts were between 2.00g/t and 4.00g/t and the remaining 10% above 4.00g/t. This raw data demonstrates that the higher-grade components of the Jennifer and Laura lodes sit within a large low-grade system. The company expects this to become even further apparent when the company completes its Maiden Mineral Resource estimation which is currently in progress. The information summarised in this release is the majority of the final 26 RC drill holes (for 4,238m) and three diamond tails (for 303m) completed in 2019. Assays for the final two RC holes drilled in 2019(into a nickel-copper target), and one diamond tail at Rebecca are yet to be returned from the lab. Apollo's drilling over the duration of the 2019 drilling campaign has built a strong understanding of this key mineralised system, which now comprises three major sub-parallel surfaces of disseminated sulphide gold mineralisation (Jennifer, Laura and Maddy lodes), flanked by stacked sheets of lower grade disseminated sulphide material. Together these surfaces represent a substantial west-dipping gold system that currently extends over 1.7km in strike), several hundred metres width and remains open at depth down-dip.