Mesa Park Project

Sunday, Jan. 28, into Monday, Jan. 29
7 p.m. - 5 a.m. (nightly)

  • East- and westbound Executive exit ramps will be closed
  • Complete closure on Executive Center Boulevard east- and westbound between Doniphan Drive and Mesa Street

Monday, Jan. 29, into Tuesday, Jan. 30
9 p.m. - 5 a.m. (nightly)

  • East- and westbound Executive exit ramps will be closed
  • Complete closure on Executive Center Boulevard east- and westbound between Doniphan Drive and Mesa Street
  • Crews will be reconstructing the intersection

Guardrail Repair Project

Monday, Jan. 29
9 a.m. - 3 p.m. (throughout the day)

  • Right lane closure on I-10 westbound between Artcraft entrance ramp and Transmountain exit ramp
  • Westbound Transmountain (flyover) exit ramp will be closed

Tuesday, Jan. 30
9 a.m. - 3 p.m. (throughout the day)

  • Center lane closure on Fred Wilson eastbound at the Spur 601 entrance ramp
  • Right lane closure Spur 601 eastbound between US 54 entrance ramp to Chaffee exit ramp
  • Eastbound Chaffee exit ramp will be closed

Wednesday, Jan. 31
9 a.m. - 3 p.m. (throughout the day)

  • Left lane closure on Gateway West between the Piedras entrance ramp and Raynor Street
  • Westbound Piedras exit ramp will be closed

Thursday, Feb. 1
9 a.m. - 3 p.m. (throughout the day)

  • Right lane closure on US 54 northbound between Cassidy entrance ramp and Spur 601 entrance ramp
  • Right lane closure on Gateway South between Fred Wilson and Cassidy

Thursday, Feb. 2
9 p.m. - 5 a.m. (night closure)

  • Right lane closure on I-10 westbound between the Dallas entrance ramp and the Mesa (19A) exit ramp
  • Westbound Mesa (19A) exit ramp will be closed
  • Center lane closure on Wyoming eastbound between Stanton Street and Kansas Street
  • Eastbound Wyoming entrance ramp will be closed to I-10
  • Crews will be repairing damaged guardrail in the area.

Maintenance

Monday, Jan. 29 - Friday, Feb. 2
9 a.m. - 3 p.m. (throughout the day)

  • Right lane closure on North and South Desert Boulevard between Vinton Road and Anthony Road
  • Right lane closure on Cesar Chavez/Border Highway (Loop 375) eastbound between US 54 and Fonseca Drive
  • Eastbound Fonseca exit ramp will be closed
  • Alternate lane closures north and southbound on I-110
  • Left lane closure on North and South Desert Boulevard between Vinton and Anthony

Green Ribbon Landscape Project

Monday - Friday (until further notice)
9 a.m. - 3 p.m. (throughout the day)

  • Center median work on Dyer (BU 54) north and southbound between Woodrow Bean/Transmountain (Loop 375) and Angora Loop
  • Alternate lane closure on Dyer (SL 478) north and southbound between Gateway Boulevard South and Kemp Avenue
  • Crews will be working on landscaping the area.

US 54 Widening and Illumination Project

Monday, Jan. 29 -Friday, Feb. 2
9 a.m. - 4 p.m. (throughout the day)

  • Alternate lane closure on Gateway Boulevard North and South between Hondo Pass Drive and Transmountain
  • Northbound Hondo Pass turnaround will be closed
  • Alternate ramp closures entrance and exit as needed between Hondo Pass Drive and Transmountain
  • Alternate lane closures at the Diana underpass

Monday, Jan. 29 -Friday, Feb. 2
9 p.m. - 5 a.m. (nightly; ramp closures as needed only)

  • Complete closure on US 54 northbound between Hondo Pass Drive and Transmountain overpass
  • Northbound Hondo Pass entrance ramp will be closed on US 54
  • Northbound Diana exit ramp will be closed on US 54
  • Northbound Transmountain exit ramp will be closed on US 54
  • Detour: Northbound traffic will need to exit at the Hondo Pass exit ramp and re-enter at the Sun Valley entrance ramp

Monday, Jan. 29 - Friday, Feb. 2
9 p.m. - 5 a.m. (nightly; ramp closures as needed only)

  • Complete closure on US 54 southbound between Sean Haggarty entrance ramp to Hondo Pass overpass
  • Southbound Kenworthy entrance ramp will be closed to US 54
  • Southbound Sun Valley entrance ramp will be closed to US 54
  • Southbound Transmountain entrance and exit ramps will be closed
  • Southbound Diana entrance and exit ramps will be closed
  • Southbound Hondo Pass exit ramp will be closed
  • Detour: Southbound traffic on US 54 will continue on frontage road from Sean Haggarty to the Hondo Pass entrance ramp.
  • Crews will be constructing a third lane in the area.

Texas Department of Transportation published this content on 25 January 2018 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 25 January 2018 23:49:03 UTC.

Original documenthttp://www.txdot.gov/inside-txdot/media-center/local-news/el-paso/025-2018.html

Public permalinkhttp://www.publicnow.com/view/4F970F8289C80B90D7B77431B42044B921F50339