DEME has been awarded a substantial contract to carry out the transport and installation works for the inter-array cables and secondary steel for the OranjeWind offshore wind farm in the Netherlands. With an installed capacity of nearly 800 MW, the wind farm is being developed by a joint venture of RWE and TotalEnergies.