NexGen Energy Ltd. announced additional exciting 2024 and winter 2025 assay results from exploration at Patterson Corridor East ("PCE"). Assays from 2024 are now fully received. NexGen will continue to add resources through its efficient discovery and delineation of uranium resources to its already world recognized Rook I Project and prospective land holdings that remains over 95% unexplored.
Resource modelling in conjunction with an updated mineral resource estimate is required before true thicknesses can be determined. Results for RK-24-222 from 604.5 to 621.5 m previously reported on May 27, 2025 and shown here for complete reference. Drillhole, Unconformity Depth (m), SRC Geoanalytical Results (Cutoff 0.01%), Hole ID, Azimuth, Dip, Total Depth (m), From (m), To (m), width (m), U3O8 (wt%), RK-25-225, 330, -70, 684, 108.6, 474.5, 2.5, 0.02, 479.5, 480, 0.16, 482.5, 482.5, 0.12, 485, 1.5, 0.01, 488, 489, 1, 0.02, 491.5, 0.01.5, 0.02., 498.5 m previously announced on May 27, 2025.

















